Templates
Free sealed-document templates, sized for a P.Eng or OAA seal.
Word templates matching Ontario conventions for the sealed narrative documents an engineering firm produces. Structural FRR is live and downloadable now. The rest release in three tiers below - what is live today, what Fermito can build as a firm-specific template pack in 2-4 weeks, and what is next on the roadmap.

Available now
Live today.
Downloadable Word templates Fermito generates end-to-end. More disciplines land as each passes the same review pass.
Structural FRR
AvailableThe workhorse template. Site visit under OBC 1.2.2.2, observations + photos + recommendations, revision history section, signature block sized for a P.Eng seal.
OBC 1.2.2.2 - PEO Reg 941
Download .docx
Ready on request
Your firm's specific template, in 2-4 weeks.
Fermito's voice, photo, and narrative primitives already handle these sealed documents. Request a template pack - we build it to match your firm's house format and generate from day one.
Non-Conformance Report
Ready on requestField-deficiency write-up for structural work that departs from the permitted design. Same photo + observation + narrative shape as the FRR; built for the PEO standard-of-care review file.
PEO standard of care - firm QA
Punch List / Deficiency Enumeration
Ready on requestEnumerated deficiencies with photos, grouped by location. Structural-signed take-over list matching CCDC 2 General Conditions 5.4.
CCDC 2 GC 5.4 - structural
Condo Act s.44 Performance Audit
Ready on requestMandatory first-year performance audit for every new Ontario condo corporation. Element-by-element narrative + photos, sealed by the reviewing P.Eng.
Condo Act s.44 - O. Reg. 48/01
Read the primerTarion Warranty Report
Ready on requestStructural warranty site visit and narrative for Tarion claims under O. Reg. 165/08. Same skeleton as the FRR; sealed output routed into the warranty file.
Tarion - O. Reg. 165/08
Balcony Guard Inspection
Ready on requestPer-balcony enumeration with photos on the Toronto 3-year cycle under Municipal Code Ch. 629. High-repetition output; same revision chain as the FRR.
Toronto Municipal Code Ch. 629
Architectural General Review
Ready on requestOBC 1.2.2.2 general review for OAA-signed work. Parallel to the structural FRR - same workflow, architect's vocabulary and seal layout.
OBC 1.2.2.2 - OAA Practice Tip PT.37
Architectural Deficiency / Punch List
Ready on requestTake-over deficiency list prepared by the architect of record. Photo-heavy, enumerated by location, signed at take-over under CCDC 2 GC 5.4.
CCDC 2 GC 5.4 - architectural
Warranty Review Report (11-month / 1-year)
Ready on requestEnd-of-warranty review for new builds - architect or P.Eng walkthrough with observations, photos, and a recommended repair list for the builder or Tarion file.
Tarion - CCDC 2 GC 12
Post-Occupancy Evaluation
Ready on requestNarrative-led POE for institutional clients or LEED O+M. Walkthrough observations plus a lightweight occupant-survey sidecar, signed by the architect of record.
OAA practice - LEED O+M
Mechanical Commissioning Report
Ready on requestCx narrative bundling functional-performance tests, system-level observations, and photos. Sealed by the commissioning authority or mechanical engineer of record.
CSA Z5000 - LEED v4 Cx
Fire Alarm Verification Report
Ready on requestCAN/ULC-S537 verification output - test matrix plus narrative, sealed by the verification engineer. Mandatory for every new commercial fire alarm system in Ontario.
CAN/ULC-S537
Emergency Power System Report
Ready on requestAnnual emergency-generator load test and report under CSA C282. Narrative plus test observations, sealed by the electrical engineer.
CSA C282
On the roadmap
Next directions.
Committed expansions we are building next. Join the waitlist for any of these and we will update you as each lands.
Sealed opinion letter
On the roadmapShort-form primitive for the 1-3 page sealed letters every discipline signs at high volume - structural adequacy, RTU supports, occupancy readiness, code compliance, ESA declarations. Cross-discipline, coming after the first firm signs.
Cross-discipline - Tier 2 build
Reserve Fund Study
On the roadmapCondo Act s.94 RFS - component inventory and 30-year cashflow projection, sealed by a P.Eng or RRC. Phase 5 of the Fermito roadmap; signals from the waitlist drive build order.
Condo Act s.94 - O. Reg. 48/01
Building Condition Assessment
On the roadmapCSA S478 condition assessment with element-by-element rating and capital-reserve projection. Shares the component-inventory primitive with the RFS build.
CSA S478 - CMHC BCA Standard
Get notified
First in line when each template drops.
One email per release. Structural is live now. Other disciplines follow once each passes the same review pass.